This study undertaken in a pristine environmentally sensitive region with no industrial infrastructure concerns the development of this field in an undeveloped virgin petroleum basin around Lake Albert in Uganda. The scope includes building a reservoir simulation model from the client supplied geo-science model to optimize the field development including the number and location of wells. The facilities, flowlines and pipeline definition includes conceptual engineering, process simulation and design and flow assurance. The scope also includes the crude oil export infrastructure that consists of pipelines, terminals as well as rail and inland water transport. Power generation and transmission concepts were an important part of this study. The project controls scope consists of project and cost scheduling, CAPEX and activity based OPEX estimating.