EPConsult Energies - An introduction to our Specialist Consultancy Service. Video - May 2016 
EPConsult Energies is pleased to launch our Double Footprint approach, which will provide operators with a de-risked high integrity approach for implementation of their energy projects. To understand more have a look at our Double Footprint page.
Amtek Aluminium – an Energy Audit was conducted at the premises of Amtek Aluminium in order to identify energy saving opportunitiesThe proposed measures in the report had the potential to lead to an overall reduction in energy usage by up to 32% with a potential saving of more than £600,000 per year. The revenue generated from the energy saving measures could be £4.9m in 10 years and the environmental benefit could reach 3,…
Hear how we provide Efficient Low-Cost Asset Integrity Management Solutions in a Low Oil Price Market. Podcast - March 2016 
OVL – CAPEX Re-Estimate for the Farzad B Gas Field. As part of performing an update to the Master Development Plan for the Farzad B gas field, located in the Farsi Block in Gulf waters, EPEn has prepared an update to the original CAPEX Estimate for the full field development project. The block has an area of about 3500 sq km in water depths ranging from 20-90m. The development includes production wells, offshore platforms, inter-field pipelines…
Energy Business Summit – EPConsult Energies is Chairing a Workshop on “Driving Down Costs through Emerging Technologies” - UK Energy Business Summit – London 14 April, 2016. Technology, Efficiency and Optimisation are key factors in targeting the challenges relating to securing energy supply going forward. If we can introduce new technologies to control processes for energy production, transmission and consumption, be smarter about it, we…
When is a confined space not a Confined Space?What are the risks associated with confined spaces in relation to offshore wind electricity generation and its implications on any person at work?Read the full article, contributed by EPConsult Energies’ Principal Engineer – Phil Davis/, on pg 48 of the latest Wind&Wave connect publication here:http://issuu.com/bickers/docs/ww_edition_15/0 
This year our Principal Consultant – David Price is chairing a leading conference on Asset Integrity Management taking place in Aberdeen, UK on the 15-17th of September. The Asset Integrity Management Summit will provide you with New Strategies and Techniques on how to overcome the challenges of implementing and maintaining a Robust Integrity Plan. Europe’s leading asset integrity management summit will…
The Bab field is located in a desert area, approximately 160 km southwest of Abu Dhabi. The field covers an area of approximately 45 km by 25 km. The main processing facilities are located around Bab Habshan. The field is sour with high H2S content. Bab injects aquifer water into the producing zones as the pressure maintenance strategy. Associated gas separated at the BCDS is delivered to GASCO for processing and processed Crude Oil is pumped to…
The Lincs development is a 270MW offshore wind farm covering an overall area of 35km2, located in water depths of 8 to 18m, approximately 8km from the coast off Skegness, Lincolnshire.The scope of the risk assessment was to identify and record the potential hazards arising within the transition piece and look at the components and scenarios that are flammable or may emit gas, fumes or vapour or the lack of oxygen that would cause the loss of…